Pastor Appreciation Day

Written by: Maureen Kaiser Cultural Engagement Specialist Every Sunday, Jasper Ventures employees sit in church pews across East Texas and listen as their pastors faithfully bring instruction and encouragement. On August 22, the Beyond Business department turned the tables and offered nearly 30 pastors and ministry leaders the chance to listen and receive encouragement at […]

Midstream:
1994 to Present

Written by: John JasperFounder and Chairman Jasper Ventures is involved with the Midstream segment of the oil and gas industry and focuses primarily on design, fabrication, and installation of the equipment required to process the natural gas of Midstream. This is the second in a series of articles by Jon Jasper, founder and Chairman of […]

Department Spotlight: Field Construction

Written by: Jim NewbergI&E Manager Field Construction is a team of rarely seen, hard-working individuals that make up Vulcan, the construction division of Jasper Ventures. This team starts with a completely barren piece of surveyed land then takes the engineered and designed concepts along with prefabricated parts and equipment to create a finished plant. The […]

A Word From Leadership

Written by: Carrie-Ann Jasper-YeartyVice President of People  Jasper Ventures’ vision statement explains the reason behind everything we do: “We are a Christ-centered family of companies creating unparalleled value for our employees, clients, and communities.” The leadership team crafted this vision to define not only who but “why” we are. We know that not everyone’s “why” […]

Going With the Gospel

Written by Leslie StraderJasper Journal Editorial Board Member Whether it’s programming in a plant or testing in the field, as Veritas’ Instrument and Electrical Manager, Jim Newberg is invaluable to the team at Jasper Ventures. But he’s made an even bigger impact 2,000 miles away hiking on a mountainside in the middle of nowhere. With […]

New Jasper Journal

We are pleased to share our latest edition of the Jasper Journal with you! The Jasper Journal is a quarterly publication that takes you behind the scenes and into the core of our corporate culture. The Journal also celebrates the positive impact that Jasper Ventures and its employees are having on our local communities and […]

UT Tyler Names New Jasper Department of Chemical Engineering

Originally posted by UT TylerMedia Contact: Beverly GoldenSenior Director of Media RelationsMarketing and Communications The University of Texas at Tyler announced today a multimillion dollar gift to the University to endow and name the new Jasper Department of Chemical Engineering. The gift is the largest in the history of UT Tyler’s College of Engineering. “We are […]

Like Father, Like Sons

Article from the Jasper Journal 3rd Quarter 2019 Written by: Carrie-Ann Jasper-Yearty Family Spotlight on the Glovers Mike Glover comes from a long line of draftsmen, so after serving in the Air Force, he went to night school to follow in his grandfather’s footsteps. In 2003, when the timing was right, Mike left what had […]

Midstream: the Last 100 Years

Article from the Jasper Journal 3rd Quarter 2019Written by: Jon Jasper   Jasper Ventures is involved with the Midstream segment of the oil and gas industry and focuses primarily on design, fabrication, and installation of the equipment required to process the natural gas of Midstream. This is the second in a series of articles by Jon […]

A Point in Time

Article from the Jasper Journal 3rd Quarter 2019Written by: Kevin Strawbridge   What an honor it is to join the Jasper Ventures team! Jasper’s strong growth journey over the last few years makes it a great time to be here. I am humbled by the experience, passion, and drive of the team members I am working […]

Job 347

250 GPM Amine Treating Plant

Designed and fabricated 250 gpm amine treating plant. Shreveport, Louisiana.

Job 420

200 MMSCFD Cryogenic Gas Plant

200 MMSCFD Cryogenic Gas Plant designed for rich Delaware Basin shale gas (7.0 gal/mscf), 90% ethane recovery, 99+% propane recovery, and includes: Product pumps (1,300 psig discharge pressure), and 30,000 gallon product surge tank Modular MCC building, with 480 volt MCC and 4,160 volt soft starts for three 1,250 HP motors, 4,500 HP refrigeration system, I/A system, ethane rejection and recovery capability.

Job 297

Refurbished Cryogenic Plant

Redesigned and refurbished cryogenic turbo-expander plant with amine product testing. Carthage, Texas.

Job 316

50 MMSCFD Cryogenic Gas Plant

Redesigned and refurbished 50 MMSCFD cryogenic turbo-expander plant. Liberty, Texas.

Job 325

35 MM/D Cryogenic Gas Plant

35 MM/D Cryo Plant, Indian Creek Gas Plant, Roberts County, TX, Ex-works Shop.

Job 327

200 MM/D HCDP Plant

200 MM/D HCDP Plant, Sligo, Haughton, LA, Ex-Works Shop.

Job 329, Turnkey

60 MM/D Cryogenic Gas Plant

60 MM/D Cryo Plant, Spearman Gas Plant, Spearman, TX, Turnkey installed.

Job 341, Turnkey

Dehydration Capacity Upgrade

Dehydration Capacity Upgrade, Arapaho 1, Butler, OK, Turnkey Installed.

Job 382

120 MMSCFD Cryogenic Gas Plant

120 MMSCFD Cryogenic Gas Plant designed for rich Delaware Basin shale gas (6.0 gal/mscf), 90% ethane recovery, 99+% propane recovery, and includes: Product treating system, product pumps (1,300 psig discharge pressure), and 30,000 gallon product surge tank, modular MCC building, with 480 volt MCC and 4,160 volt soft starts for three 1,250 HP motors, 4,500 HP refrigeration system, I/A system, ethane rejection and recovery capability.

Job 387

60 MMSCFD Cryogenic Gas Plant

60 MMSCFD Cryogenic Gas Plant, Eddy County, NM, including inlet separator, slug catcher, and stabilization for 4,000 bpd of high-pressure hydrocarbon condensate to 770 bpd of stabilized (10 psia RVP) condensate.

Job 388

200 MMSCFD Cryogenic Gas Plant

200 MMSCFD Cryogenic Gas Plant designed for rich Delaware Basin shale gas (6.0 gal/mscf), 90% ethane recovery, 99+% propane recovery, and includes: Product pumps (1,300 psig discharge pressure), and 30,000 gallon product surge tank, modular MCC building, with 480 volt MCC and 4,160 volt soft starts for three 1,250 HP motors 4,500 HP refrigeration system, I/A system, ethane rejection and recovery capability.

Job 417

200 MMSCFD Cryogenic Gas Plant

200 MMSCFD Cryogenic Gas Plant designed for rich Delaware Basin shale gas (7.0 gal/f), 90% ethane recovery, 99+% propane recovery, and includes: Product pumps (1,300 psig discharge pressure), and 30,000 gallon product surge tank Modular MCC building, with 480 volt MCC and 4,160 volt soft starts for three 1,250 HP motors 4,500 HP refrigeration system, I/A system, ethane rejection and recovery capability. A high-pressure hydrocarbon condensate stabilization system is included along with an 800 GPM inlet amine treater.

Job 299

20 MMSCFD Cryogenic Gas Plant For Counterpoint Energy

Redesigned and refurbished 20 MMSCFD cryogenic plant for CenterPoint Energy. Haughton, Louisiana.

Job 345

60 MMSCFD Refrigeration Addition

Designed and fabricated 60 MMSCFD refrigeration addition to increase recovery. Butler, Oklahoma.

Job 318

30 MM/D Cryogenic Gas Plant

30 MM/D Cryo Plant, Waskom 2, Waskom, TX, Turnkey Installed

Job 321

70 MM/D Cryogenic Gas Plant

70 MM/D Cryo Plant, Waskom 3, Waskom, TX, Turnkey installed

Job 322

25 MMSCFD Refrigeration Plant with Stabilizer

Designed and fabricated 25 MMSCFD refrigeration plant with stabilizer. Pampa, Texas.

Job 326

100 MM/D Cryogenic Gas Plant

100 MM/D Cryo Plant, West Johnson Co Gas Plant, West Johnson County, TX, Phase 2

Job 328, Turnkey

80 MM/D Cryogenic Gas Plant

80 MM/D Cryo Plant, Crossroads Gas Plant, Harrison County, TX, Turnkey installed.

Job 330, Turnkey

60 MM/D Cryogenic Gas Plant

60 MM/D Cryo Plant, Arapaho 2 Gas Plant, Butler, OK, Turnkey installed

Job 331, Turnkey

80 MM/D Cryogenic Gas Plant

80 MM/D Cryo Plant, Carthage 2 Gas Plant, Carthage, TX, Turnkey installed

Job 332

35 MM/D Cryogenic Gas Plant

35 MM/D Cryo Plant, Cobb Gas Plant, Clendinin, WV, Ex-Works

Job 340

120 MM/D Cryogenic Gas Plant

120 MM/D Cryo Plant with Depropanizer, Houston 2 Gas Plant, Houston, PA, Ex-works.

Job 342

500 HP Refrigeration Addition

500 HP Refrigeration Addition, Arapaho 2 & NGL Booster Pump Addition, Arapaho 1, Butler, OK.

Job 408

200 MMSCFD Cryogenic Gas Plant

200 MMSCFD Cryogenic Gas Plant designed for rich Delaware Basin shale gas (6.0 gal/mscf), 90% ethane recovery, 99+% propane recovery, and includes: Product pumps (1,300 psig discharge pressure), and 30,000 gallon product surge tank, modular MCC building, with 480 volt MCC and 4,160 volt soft starts for three 1,250 HP motors 4,500 HP refrigeration system, I/A system, ethane rejection and recovery capability.