On April 19, Veritas Gas Processing was honored with the Business of the Year award by the Troup Chamber of Commerce. Veritas Gas Processing is one of four operating companies of Jasper Ventures, Inc. The predecessor company was founded by Jon Jasper under the name EPC, Inc. and has been employing East Texans since March, 1992. It remains 100% family-owned to this day.

Jasper Ventures purchased what was previously the Challenger facility in Troup in December, 2016, and invested heavily to renovate and convert the buildings. It now serves as its primary fabrication location for building modular gas processing plants for the midstream oil and gas industry.

The 16+ acre Troup facility has 64,000 square feet of warehouse and covered storage space, an abrasive blast booth, paint booth, and structural steel shop, as well as 6,000 square feet of office space. In addition, the company is completing construction of a state-of-the-art office in Whitehouse that will serve as the company’s new headquarters. The office will open its doors in May, 2018.

The Troup facility officially re-opened its doors for business in February, 2017 and was staffed with 50 people at that time. In less than a year, as of April 1, that number has increased to 88. Overall, the Jasper Ventures family of companies employs close to 250 people. And the outlook for future growth remains positive.

Shawn Forgy, Project Construction Manager, proudly accepted the award on behalf of Veritas Gas Processing.

“Relocating our manufacturing to Troup was a great move for Veritas,” Shawn said. “We have been able to increase our capacity and operate a few miles from our corporate office rather than 40 (miles). The talent in Troup and the greater Tyler area has allowed us to more than double our staff with excellent craft people. We are able to provide well-paying entry-level jobs. A young person with the right attitude can do more than just get a job with us. They can build a career with Veritas.

“I grew up in Troup and graduated high school here,” he continued. “It’s an honor to be part of something that, over two decades later, is still having a positive impact on the local economy. One of our core values is, “To cultivate a spirit of service toward one another, our clients and our community.” This recognition by the Chamber is reassurance that we are living up to that.”

CLICK BELOW TO READ THE JASPER JOURNAL ONLINE

Please feel free to distribute to friends, family, vendors or anyone you think might enjoy learning more about our company. The direct link for this edition of the journal is: https://indd.adobe.com/view/2d48746a-0b0f-4019-849d-4f9e09089e9e

For the latest news about Jasper Ventures visit www.jasperventuresinc.com/latest-news-media

Job 347

250 GPM Amine Treating Plant

Designed and fabricated 250 gpm amine treating plant. Shreveport, Louisiana.

Job 420

200 MMSCFD Cryogenic Gas Plant

200 MMSCFD Cryogenic Gas Plant designed for rich Delaware Basin shale gas (7.0 gal/mscf), 90% ethane recovery, 99+% propane recovery, and includes: Product pumps (1,300 psig discharge pressure), and 30,000 gallon product surge tank Modular MCC building, with 480 volt MCC and 4,160 volt soft starts for three 1,250 HP motors, 4,500 HP refrigeration system, I/A system, ethane rejection and recovery capability.

Job 297

Refurbished Cryogenic Plant

Redesigned and refurbished cryogenic turbo-expander plant with amine product testing. Carthage, Texas.

Job 316

50 MMSCFD Cryogenic Gas Plant

Redesigned and refurbished 50 MMSCFD cryogenic turbo-expander plant. Liberty, Texas.

Job 325

35 MM/D Cryogenic Gas Plant

35 MM/D Cryo Plant, Indian Creek Gas Plant, Roberts County, TX, Ex-works Shop.

Job 327

200 MM/D HCDP Plant

200 MM/D HCDP Plant, Sligo, Haughton, LA, Ex-Works Shop.

Job 329, Turnkey

60 MM/D Cryogenic Gas Plant

60 MM/D Cryo Plant, Spearman Gas Plant, Spearman, TX, Turnkey installed.

Job 341, Turnkey

Dehydration Capacity Upgrade

Dehydration Capacity Upgrade, Arapaho 1, Butler, OK, Turnkey Installed.

Job 382

120 MMSCFD Cryogenic Gas Plant

120 MMSCFD Cryogenic Gas Plant designed for rich Delaware Basin shale gas (6.0 gal/mscf), 90% ethane recovery, 99+% propane recovery, and includes: Product treating system, product pumps (1,300 psig discharge pressure), and 30,000 gallon product surge tank, modular MCC building, with 480 volt MCC and 4,160 volt soft starts for three 1,250 HP motors, 4,500 HP refrigeration system, I/A system, ethane rejection and recovery capability.

Job 387

60 MMSCFD Cryogenic Gas Plant

60 MMSCFD Cryogenic Gas Plant, Eddy County, NM, including inlet separator, slug catcher, and stabilization for 4,000 bpd of high-pressure hydrocarbon condensate to 770 bpd of stabilized (10 psia RVP) condensate.

Job 388

200 MMSCFD Cryogenic Gas Plant

200 MMSCFD Cryogenic Gas Plant designed for rich Delaware Basin shale gas (6.0 gal/mscf), 90% ethane recovery, 99+% propane recovery, and includes: Product pumps (1,300 psig discharge pressure), and 30,000 gallon product surge tank, modular MCC building, with 480 volt MCC and 4,160 volt soft starts for three 1,250 HP motors 4,500 HP refrigeration system, I/A system, ethane rejection and recovery capability.

Job 417

200 MMSCFD Cryogenic Gas Plant

200 MMSCFD Cryogenic Gas Plant designed for rich Delaware Basin shale gas (7.0 gal/f), 90% ethane recovery, 99+% propane recovery, and includes: Product pumps (1,300 psig discharge pressure), and 30,000 gallon product surge tank Modular MCC building, with 480 volt MCC and 4,160 volt soft starts for three 1,250 HP motors 4,500 HP refrigeration system, I/A system, ethane rejection and recovery capability. A high-pressure hydrocarbon condensate stabilization system is included along with an 800 GPM inlet amine treater.

Job 299

20 MMSCFD Cryogenic Gas Plant For Counterpoint Energy

Redesigned and refurbished 20 MMSCFD cryogenic plant for CenterPoint Energy. Haughton, Louisiana.

Job 345

60 MMSCFD Refrigeration Addition

Designed and fabricated 60 MMSCFD refrigeration addition to increase recovery. Butler, Oklahoma.

Job 318

30 MM/D Cryogenic Gas Plant

30 MM/D Cryo Plant, Waskom 2, Waskom, TX, Turnkey Installed

Job 321

70 MM/D Cryogenic Gas Plant

70 MM/D Cryo Plant, Waskom 3, Waskom, TX, Turnkey installed

Job 322

25 MMSCFD Refrigeration Plant with Stabilizer

Designed and fabricated 25 MMSCFD refrigeration plant with stabilizer. Pampa, Texas.

Job 326

100 MM/D Cryogenic Gas Plant

100 MM/D Cryo Plant, West Johnson Co Gas Plant, West Johnson County, TX, Phase 2

Job 328, Turnkey

80 MM/D Cryogenic Gas Plant

80 MM/D Cryo Plant, Crossroads Gas Plant, Harrison County, TX, Turnkey installed.

Job 330, Turnkey

60 MM/D Cryogenic Gas Plant

60 MM/D Cryo Plant, Arapaho 2 Gas Plant, Butler, OK, Turnkey installed

Job 331, Turnkey

80 MM/D Cryogenic Gas Plant

80 MM/D Cryo Plant, Carthage 2 Gas Plant, Carthage, TX, Turnkey installed

Job 332

35 MM/D Cryogenic Gas Plant

35 MM/D Cryo Plant, Cobb Gas Plant, Clendinin, WV, Ex-Works

Job 340

120 MM/D Cryogenic Gas Plant

120 MM/D Cryo Plant with Depropanizer, Houston 2 Gas Plant, Houston, PA, Ex-works.

Job 342

500 HP Refrigeration Addition

500 HP Refrigeration Addition, Arapaho 2 & NGL Booster Pump Addition, Arapaho 1, Butler, OK.

Job 408

200 MMSCFD Cryogenic Gas Plant

200 MMSCFD Cryogenic Gas Plant designed for rich Delaware Basin shale gas (6.0 gal/mscf), 90% ethane recovery, 99+% propane recovery, and includes: Product pumps (1,300 psig discharge pressure), and 30,000 gallon product surge tank, modular MCC building, with 480 volt MCC and 4,160 volt soft starts for three 1,250 HP motors 4,500 HP refrigeration system, I/A system, ethane rejection and recovery capability.