Jasper Announces New President

Whitehouse, Texas – Jasper is proud to announce the appointment of Neil Eckersley as the company’s new president. Neil brings a wealth of experience in the midstream industry gained during his tenure at Honeywell with UOP LLC, UOP Russell, and UOP Callidus. His impressive track record includes achievements in product development, technical service, account management, sales leadership, and P&L ownership. Neil’s experience as the integration leader when Honeywell acquired the Thomas Russell Company and his continued role as the General Manager over that business unit for a decade makes him the right candidate to lead Jasper’s EPC operations.

Brent Jasper, CEO of Jasper, expressed his enthusiasm about the new addition to the team. “This is a monumental hire for the company. I like to think that Jon Jasper and Tom Russell would both be proud to see this happening. Neil is an amazing man and leader, and I am thrilled that he is joining the Jasper team,” said Jasper. “We hired Allen Erickson as Chief Process Engineer in March, and with the addition of Neil now, we are building quite the ‘dream team.’ These guys have a lot of great accomplishments and respect in the midstream world, and I’m excited to see how we can better serve the industry under Neil’s leadership.”

Eckersley’s appointment marks a significant milestone for Jasper, hiring the first non-family member to lead the company, as well as reflecting upon the company’s dedication to strengthening its leadership team with industry visionaries. Under Neil’s guidance, Jasper aims to further enhance its position as a key player in the midstream sector, providing innovative gas processing solutions and exceptional services to clients worldwide.

_____________________________________________________________________________________

Jasper is a family-owned company headquartered in Whitehouse, TX in operation since 1992. Jasper’s core focus is the engineering, design, fabrication, installation, leasing and operation of natural gas processing facilities, including cryogenic gas processing plants, mechanical refrigeration units, process treating equipment and other midstream processing equipment. Jasper consistently offers the highest quality and most cost-effective solutions for any midstream project. The company has designed and installed plants in all the major US basins, as well as internationally. For more information, visit www.JasperVenturesInc.com.

Job 423

200 MMSCFD Cryogenic Plant

Jasper has successfully completed and fully executed a LSTK EPC project in the Delaware basin for a repeat client. This is the third train Jasper has completed at this location. The client chose Jasper’s standard 200 MMSCFD Cryogenic Plant, along with a 290 GPM Amine Inlet Treater and 3800 BPD Single Tower Stabilizer, interconnecting piping, flare, utilities, instrumentation, electrical, MCC, foundations, and a fully automated Allen Bradley ControlLogix control system with Wonderware front end.

Job 318

30 MM/D Cryogenic Gas Plant

30 MM/D Cryo Plant, Waskom 2, Waskom, TX, Turnkey Installed

Job 297

Refurbished Cryogenic Plant

Redesigned and refurbished cryogenic turbo-expander plant with amine product testing. Carthage, Texas.

Job 316

50 MMSCFD Cryogenic Gas Plant

Redesigned and refurbished 50 MMSCFD cryogenic turbo-expander plant. Liberty, Texas.

Job 325

35 MM/D Cryogenic Gas Plant

35 MM/D Cryo Plant, Indian Creek Gas Plant, Roberts County, TX, Ex-works Shop.

Job 327

200 MM/D HCDP Plant

200 MM/D HCDP Plant, Sligo, Haughton, LA, Ex-Works Shop.

Job 329, Turnkey

60 MM/D Cryogenic Gas Plant

60 MM/D Cryo Plant, Spearman Gas Plant, Spearman, TX, Turnkey installed.

Job 341, Turnkey

Dehydration Capacity Upgrade

Dehydration Capacity Upgrade, Arapaho 1, Butler, OK, Turnkey Installed.

Job 382

120 MMSCFD Cryogenic Gas Plant

120 MMSCFD Cryogenic Gas Plant designed for rich Delaware Basin shale gas (6.0 gal/mscf), 90% ethane recovery, 99+% propane recovery, and includes: Product treating system, product pumps (1,300 psig discharge pressure), and 30,000 gallon product surge tank, modular MCC building, with 480 volt MCC and 4,160 volt soft starts for three 1,250 HP motors, 4,500 HP refrigeration system, I/A system, ethane rejection and recovery capability.

Job 387

60 MMSCFD Cryogenic Gas Plant

60 MMSCFD Cryogenic Gas Plant, Eddy County, NM, including inlet separator, slug catcher, and stabilization for 4,000 bpd of high-pressure hydrocarbon condensate to 770 bpd of stabilized (10 psia RVP) condensate.

Job 388

200 MMSCFD Cryogenic Gas Plant

200 MMSCFD Cryogenic Gas Plant designed for rich Delaware Basin shale gas (6.0 gal/mscf), 90% ethane recovery, 99+% propane recovery, and includes: Product pumps (1,300 psig discharge pressure), and 30,000 gallon product surge tank, modular MCC building, with 480 volt MCC and 4,160 volt soft starts for three 1,250 HP motors 4,500 HP refrigeration system, I/A system, ethane rejection and recovery capability.

Job 417

200 MMSCFD Cryogenic Gas Plant

200 MMSCFD Cryogenic Gas Plant designed for rich Delaware Basin shale gas (7.0 gal/f), 90% ethane recovery, 99+% propane recovery, and includes: Product pumps (1,300 psig discharge pressure), and 30,000 gallon product surge tank Modular MCC building, with 480 volt MCC and 4,160 volt soft starts for three 1,250 HP motors 4,500 HP refrigeration system, I/A system, ethane rejection and recovery capability. A high-pressure hydrocarbon condensate stabilization system is included along with an 800 GPM inlet amine treater.

Job 420

200 MMSCFD Cryogenic Gas Plant

200 MMSCFD Cryogenic Gas Plant designed for rich Delaware Basin shale gas (7.0 gal/mscf), 90% ethane recovery, 99+% propane recovery, and includes: Product pumps (1,300 psig discharge pressure), and 30,000 gallon product surge tank Modular MCC building, with 480 volt MCC and 4,160 volt soft starts for three 1,250 HP motors, 4,500 HP refrigeration system, I/A system, ethane rejection and recovery capability.

Job 299

20 MMSCFD Cryogenic Gas Plant For Counterpoint Energy

Redesigned and refurbished 20 MMSCFD cryogenic plant for CenterPoint Energy. Haughton, Louisiana.

Job 321

70 MM/D Cryogenic Gas Plant

70 MM/D Cryo Plant, Waskom 3, Waskom, TX, Turnkey installed

Job 425/446

200 MMSCFD Cryogenic Gas Plant

Jasper has successfully completed and fully executed a LSTK EPC project in the Delaware basin for a repeat client. This is the third train Jasper has completed at this location. This Client chose Jasper’s Standard 200MMSCFD GSP cryogenic gas plant from our inventory, Jasper Amine Contactor and pre-treatment system, Jasper 42 GPM TEG Contactor and Regen System, interconnecting piping, flare, utilities, instrumentation, electrical, MCC, foundations, and a fully automated Allen Bradley control system with Wonderware front end.
Job 322

25 MMSCFD Refrigeration Plant with Stabilizer

Designed and fabricated 25 MMSCFD refrigeration plant with stabilizer. Pampa, Texas.

Job 326

100 MM/D Cryogenic Gas Plant

100 MM/D Cryo Plant, West Johnson Co Gas Plant, West Johnson County, TX, Phase 2

Job 328, Turnkey

80 MM/D Cryogenic Gas Plant

80 MM/D Cryo Plant, Crossroads Gas Plant, Harrison County, TX, Turnkey installed.

Job 330, Turnkey

60 MM/D Cryogenic Gas Plant

60 MM/D Cryo Plant, Arapaho 2 Gas Plant, Butler, OK, Turnkey installed

Job 331, Turnkey

80 MM/D Cryogenic Gas Plant

80 MM/D Cryo Plant, Carthage 2 Gas Plant, Carthage, TX, Turnkey installed

Job 332

35 MM/D Cryogenic Gas Plant

35 MM/D Cryo Plant, Cobb Gas Plant, Clendinin, WV, Ex-Works

Job 340

120 MM/D Cryogenic Gas Plant

120 MM/D Cryo Plant with Depropanizer, Houston 2 Gas Plant, Houston, PA, Ex-works.

Job 342

500 HP Refrigeration Addition

500 HP Refrigeration Addition, Arapaho 2 & NGL Booster Pump Addition, Arapaho 1, Butler, OK.

Job 345

60 MMSCFD Refrigeration Addition

Designed and fabricated 60 MMSCFD refrigeration addition to increase recovery. Butler, Oklahoma.

Job 347

250 GPM Amine Treating Plant

Designed and fabricated 250 gpm amine treating plant. Shreveport, Louisiana.

Job 443

200 MMSCFD Cryogenic Gas Plant

Jasper has successfully completed and fully executed a LSTK EPC project in the Delaware basin for a repeat client. This is the second train Jasper has completed at this location. The client chose Jasper’s standard 200 MMSCFD Cryogenic Plant, along with a 500 GPM Amine Inlet Treater and 4000 BPD Two Tower Stabilizer, interconnecting piping, flare, utilities, instrumentation, electrical, MCC, foundations, and a fully automated Allen Bradley ControlLogix control system with Wonderware front end.

Job 445

200 MMSCFD Cryogenic Gas Plant

Jasper has successfully completed and fully executed a LSTK EPC project in the Delaware basin for a repeat client. This is the second train Jasper has completed at this location. This project consisted of a Jasper 200MMSCFD GSP cryogenic gas plant, Jasper 200 GPM MDEA NGL Treater, 4500bbl harp style slug catchers, interconnecting piping, flare, utilities, instrumentation, electrical, MCC, foundations, fully automated DELTA V control system with SIS.

Job 408

200 MMSCFD Cryogenic Gas Plant

200 MMSCFD Cryogenic Gas Plant designed for rich Delaware Basin shale gas (6.0 gal/mscf), 90% ethane recovery, 99+% propane recovery, and includes: Product pumps (1,300 psig discharge pressure), and 30,000 gallon product surge tank, modular MCC building, with 480 volt MCC and 4,160 volt soft starts for three 1,250 HP motors 4,500 HP refrigeration system, I/A system, ethane rejection and recovery capability.