Flexible Gas Processing Solutions

Maximize ROI with a cryo plant that does exactly what you need it to

Standard Offerings

Be more efficient than ever with our standardized equipment options – built to adapt to your needs

25MMSCFD Mechanical Refrigeration Unit

Available now to shorten your timeline, ensure a smooth transition, and start bringing in revenue as soon as possible

60MMSCFD Cryogenic Gas Plant

Ready-made skid mounted GSP cryogenic gas processing plant ready for shipping and installation anywhere in the world

Jasper Flex Program

Engineered to easily operate and flex between GSP and RSV based on your contract needs

Services

Whatever you need, we’ll get it done.
We offer the following services (as well as turnkey solutions for qualifying projects):

Engineering

Your plant’s design determines its effectiveness for the long haul.

Instead of settling for disjointed, unreliable engineering, count on 100+ years of engineering experience for streamlined designs that:

  • Operate efficiently
  • Optimize ROI
  • Meet the specific needs of your project

Procurement

Because an operation is only as reliable as its parts, we’ll complete your project with high-quality, cost-efficient materials. We promise:

  • Your plant will be sourced through our robust partner network built since 1992
  • You’ll benefit from preferred pricing and terms we’re able to leverage due to our high project volume

Fabrication

Rest assured the equipment we manufacture will meet your requirements. All fabrication takes place at our world-class facility in Troup, Texas, where we make sure:

  • All modules undergo trial fitting before we disassemble and deliver to you
  • All instrumentation and electrical is checked out and function tested before it leaves our plant

Field construction

When it’s finally time for construction, you can’t afford for details to get lost in translation. Our in-house engineering, fabrication, and construction teams work together so that:

  • You get lower costs and higher quality due to a reduced number of field welds
  • Your project is tailor-made from start to finish
  • We’re poised to do whatever is necessary to get your plant up and running – installation, commission, or start-up

We also install third-party cryo plants. See Additional Offerings for more information.

Plant operation & maintenance

We’re with you for the long haul. Opt for our team to operate your Jasper-built plant.

When your operation is in the hands that built it, you won’t have to worry about training or maintenance. The closed feedback loop gives your plant direct access to our engineers and designers.

Additional Offerings

We do it all so you can find the solution you need

Ex-Works

You provide the specs. We’ll build a plant to meet them.

While we’re better able to guarantee customer satisfaction with turnkey solutions, we gladly take on isolated projects, as well.

Enlist any one of our services listed above to meet your specific needs, whether it’s engineering a custom design or installing third-party cryo plants.

Leasing

Decrease downtime with our short-term gas processing solutions.

When you need a short-term solution, lease one of our mechanical refrigeration units (MRU) – built using the same high standards and quality materials as our full cryo plants. You’ll benefit from:

  • Quick deployment
  • A custom gas process evaluation

“We have worked with Jasper on three large projects and are in the initial stages of our fourth. Each project has been a great experience from start to finish and we expect the same result for the current project.”

Matt Spicer

COO, San Mateo Midstream

FAQ

We purchased a cryo plant from another provider. Now, we just need installation. Does Jasper do that?

Yes, we install third-party cryo plants.

Get in touch to talk with us about your natural gas plant field construction needs.

Yes. Some providers only purchase and resell associated processing modules, but Jasper engineers, designs, and fabricates equipment to meet your specific needs. For our clients, that means other kinds of gas processing equipment (e.g. Amine, Stabilization, etc.) at the best possible price.

Since 1992, Jasper has completed projects in pretty much every basin in the continental U.S. That includes the Permian, SCOOP/STACK, Eagle Ford, Bakken, Haynesville and Marcellus-Utica.

Yes. We have multiple 6 and 25 MMSCF/D MRUs ready for lease to meet that need. All our units can be sent out quickly so you can get up and running.

No. With us, you’ll work with the same project manager from the start of your project through its completion.

If it’s a plant we engineered, procured, fabricated, and constructed in the field, then, yes, we can operate it for you.

This has proven valuable because it creates a closed feedback loop into the engineering and design of our solutions.

Job 423

200 MMSCFD Cryogenic Plant

Jasper has successfully completed and fully executed a LSTK EPC project in the Delaware basin for a repeat client. This is the third train Jasper has completed at this location. The client chose Jasper’s standard 200 MMSCFD Cryogenic Plant, along with a 290 GPM Amine Inlet Treater and 3800 BPD Single Tower Stabilizer, interconnecting piping, flare, utilities, instrumentation, electrical, MCC, foundations, and a fully automated Allen Bradley ControlLogix control system with Wonderware front end.

Job 318

30 MM/D Cryogenic Gas Plant

30 MM/D Cryo Plant, Waskom 2, Waskom, TX, Turnkey Installed

Job 297

Refurbished Cryogenic Plant

Redesigned and refurbished cryogenic turbo-expander plant with amine product testing. Carthage, Texas.

Job 316

50 MMSCFD Cryogenic Gas Plant

Redesigned and refurbished 50 MMSCFD cryogenic turbo-expander plant. Liberty, Texas.

Job 325

35 MM/D Cryogenic Gas Plant

35 MM/D Cryo Plant, Indian Creek Gas Plant, Roberts County, TX, Ex-works Shop.

Job 327

200 MM/D HCDP Plant

200 MM/D HCDP Plant, Sligo, Haughton, LA, Ex-Works Shop.

Job 329, Turnkey

60 MM/D Cryogenic Gas Plant

60 MM/D Cryo Plant, Spearman Gas Plant, Spearman, TX, Turnkey installed.

Job 341, Turnkey

Dehydration Capacity Upgrade

Dehydration Capacity Upgrade, Arapaho 1, Butler, OK, Turnkey Installed.

Job 382

120 MMSCFD Cryogenic Gas Plant

120 MMSCFD Cryogenic Gas Plant designed for rich Delaware Basin shale gas (6.0 gal/mscf), 90% ethane recovery, 99+% propane recovery, and includes: Product treating system, product pumps (1,300 psig discharge pressure), and 30,000 gallon product surge tank, modular MCC building, with 480 volt MCC and 4,160 volt soft starts for three 1,250 HP motors, 4,500 HP refrigeration system, I/A system, ethane rejection and recovery capability.

Job 387

60 MMSCFD Cryogenic Gas Plant

60 MMSCFD Cryogenic Gas Plant, Eddy County, NM, including inlet separator, slug catcher, and stabilization for 4,000 bpd of high-pressure hydrocarbon condensate to 770 bpd of stabilized (10 psia RVP) condensate.

Job 388

200 MMSCFD Cryogenic Gas Plant

200 MMSCFD Cryogenic Gas Plant designed for rich Delaware Basin shale gas (6.0 gal/mscf), 90% ethane recovery, 99+% propane recovery, and includes: Product pumps (1,300 psig discharge pressure), and 30,000 gallon product surge tank, modular MCC building, with 480 volt MCC and 4,160 volt soft starts for three 1,250 HP motors 4,500 HP refrigeration system, I/A system, ethane rejection and recovery capability.

Job 417

200 MMSCFD Cryogenic Gas Plant

200 MMSCFD Cryogenic Gas Plant designed for rich Delaware Basin shale gas (7.0 gal/f), 90% ethane recovery, 99+% propane recovery, and includes: Product pumps (1,300 psig discharge pressure), and 30,000 gallon product surge tank Modular MCC building, with 480 volt MCC and 4,160 volt soft starts for three 1,250 HP motors 4,500 HP refrigeration system, I/A system, ethane rejection and recovery capability. A high-pressure hydrocarbon condensate stabilization system is included along with an 800 GPM inlet amine treater.

Job 420

200 MMSCFD Cryogenic Gas Plant

200 MMSCFD Cryogenic Gas Plant designed for rich Delaware Basin shale gas (7.0 gal/mscf), 90% ethane recovery, 99+% propane recovery, and includes: Product pumps (1,300 psig discharge pressure), and 30,000 gallon product surge tank Modular MCC building, with 480 volt MCC and 4,160 volt soft starts for three 1,250 HP motors, 4,500 HP refrigeration system, I/A system, ethane rejection and recovery capability.

Job 299

20 MMSCFD Cryogenic Gas Plant For Counterpoint Energy

Redesigned and refurbished 20 MMSCFD cryogenic plant for CenterPoint Energy. Haughton, Louisiana.

Job 321

70 MM/D Cryogenic Gas Plant

70 MM/D Cryo Plant, Waskom 3, Waskom, TX, Turnkey installed

Job 425/446

200 MMSCFD Cryogenic Gas Plant

Jasper has successfully completed and fully executed a LSTK EPC project in the Delaware basin for a repeat client. This is the third train Jasper has completed at this location. This Client chose Jasper’s Standard 200MMSCFD GSP cryogenic gas plant from our inventory, Jasper Amine Contactor and pre-treatment system, Jasper 42 GPM TEG Contactor and Regen System, interconnecting piping, flare, utilities, instrumentation, electrical, MCC, foundations, and a fully automated Allen Bradley control system with Wonderware front end.
Job 322

25 MMSCFD Refrigeration Plant with Stabilizer

Designed and fabricated 25 MMSCFD refrigeration plant with stabilizer. Pampa, Texas.

Job 326

100 MM/D Cryogenic Gas Plant

100 MM/D Cryo Plant, West Johnson Co Gas Plant, West Johnson County, TX, Phase 2

Job 328, Turnkey

80 MM/D Cryogenic Gas Plant

80 MM/D Cryo Plant, Crossroads Gas Plant, Harrison County, TX, Turnkey installed.

Job 330, Turnkey

60 MM/D Cryogenic Gas Plant

60 MM/D Cryo Plant, Arapaho 2 Gas Plant, Butler, OK, Turnkey installed

Job 331, Turnkey

80 MM/D Cryogenic Gas Plant

80 MM/D Cryo Plant, Carthage 2 Gas Plant, Carthage, TX, Turnkey installed

Job 332

35 MM/D Cryogenic Gas Plant

35 MM/D Cryo Plant, Cobb Gas Plant, Clendinin, WV, Ex-Works

Job 340

120 MM/D Cryogenic Gas Plant

120 MM/D Cryo Plant with Depropanizer, Houston 2 Gas Plant, Houston, PA, Ex-works.

Job 342

500 HP Refrigeration Addition

500 HP Refrigeration Addition, Arapaho 2 & NGL Booster Pump Addition, Arapaho 1, Butler, OK.

Job 345

60 MMSCFD Refrigeration Addition

Designed and fabricated 60 MMSCFD refrigeration addition to increase recovery. Butler, Oklahoma.

Job 347

250 GPM Amine Treating Plant

Designed and fabricated 250 gpm amine treating plant. Shreveport, Louisiana.

Job 443

200 MMSCFD Cryogenic Gas Plant

Jasper has successfully completed and fully executed a LSTK EPC project in the Delaware basin for a repeat client. This is the second train Jasper has completed at this location. The client chose Jasper’s standard 200 MMSCFD Cryogenic Plant, along with a 500 GPM Amine Inlet Treater and 4000 BPD Two Tower Stabilizer, interconnecting piping, flare, utilities, instrumentation, electrical, MCC, foundations, and a fully automated Allen Bradley ControlLogix control system with Wonderware front end.

Job 445

200 MMSCFD Cryogenic Gas Plant

Jasper has successfully completed and fully executed a LSTK EPC project in the Delaware basin for a repeat client. This is the second train Jasper has completed at this location. This project consisted of a Jasper 200MMSCFD GSP cryogenic gas plant, Jasper 200 GPM MDEA NGL Treater, 4500bbl harp style slug catchers, interconnecting piping, flare, utilities, instrumentation, electrical, MCC, foundations, fully automated DELTA V control system with SIS.

Job 408

200 MMSCFD Cryogenic Gas Plant

200 MMSCFD Cryogenic Gas Plant designed for rich Delaware Basin shale gas (6.0 gal/mscf), 90% ethane recovery, 99+% propane recovery, and includes: Product pumps (1,300 psig discharge pressure), and 30,000 gallon product surge tank, modular MCC building, with 480 volt MCC and 4,160 volt soft starts for three 1,250 HP motors 4,500 HP refrigeration system, I/A system, ethane rejection and recovery capability.