Jasper Ventures Opens Event Center

Whitehouse, Texas – Jasper Ventures is pleased to announce its new office space and event center. The new office space has allowed us to co-locate our engineering, design and drafting, automation and document control teams.  This space is truly a blessing that has already resulted in increased collaboration and teamwork. “It is neat to see the collaboration that is happening between the different groups within engineering. This new building allows all the right people to work closely without emails or phone calls. Work happens more efficiently and with less confusion,” said Jim Newberg, automation manager.

The new event center, Oak Crossing, is now open to the public and available to rent. With seating for up to 264 guests, Oak Crossing is the perfect spot for corporate meetings, conferences or celebrations like birthday parties, Quinceaneras or retirement and anniversary parties. “As owners we wanted to invest in something that has value for our employees and our local community beyond the value it brings to Jasper Ventures as a company. Our sincere hope is that as many people as possible have the opportunity to use the space going forward” said Les Campbell, vice president of shared services.

Oak Crossing Event Center can accommodate many different types of events. It has partitions which can be used to divide the facility into three separate and unique rooms allowing for a smaller and more intimate setting to meet your needs. Each space has a complete AV set-up and a temporary stage can be placed in two of the three rooms, if desired. Oak Crossing event center also has a small outdoor seating area, a large catering kitchen and a lounge. For more information or to rent the venue, go to www.JasperVenturesInc.com/Oak-Crossing.

_____________________________________________

Jasper Ventures, Inc. is a family-owned business dedicated not only to building world-class gas processing solutions for our clients but providing and caring for our employees. We do so in a way that serves God’s Kingdom and impacts the lives of those around us. In 1992, Jon Jasper’s passion and belief that he could solve these problems better than anyone else, led him to the creation of Engineering, Procurement & Construction, Inc (EPC). From the beginning, we have worked hard to make the changes necessary to provide our clients with industry-leading service. EPC was restructured in 2016 into the current Jasper Ventures family of companies. As a result, Jasper clients receive more comprehensive services than ever before.

Job 423

200 MMSCFD Cryogenic Plant

Jasper has successfully completed and fully executed a LSTK EPC project in the Delaware basin for a repeat client. This is the third train Jasper has completed at this location. The client chose Jasper’s standard 200 MMSCFD Cryogenic Plant, along with a 290 GPM Amine Inlet Treater and 3800 BPD Single Tower Stabilizer, interconnecting piping, flare, utilities, instrumentation, electrical, MCC, foundations, and a fully automated Allen Bradley ControlLogix control system with Wonderware front end.

Job 318

30 MM/D Cryogenic Gas Plant

30 MM/D Cryo Plant, Waskom 2, Waskom, TX, Turnkey Installed

Job 297

Refurbished Cryogenic Plant

Redesigned and refurbished cryogenic turbo-expander plant with amine product testing. Carthage, Texas.

Job 316

50 MMSCFD Cryogenic Gas Plant

Redesigned and refurbished 50 MMSCFD cryogenic turbo-expander plant. Liberty, Texas.

Job 325

35 MM/D Cryogenic Gas Plant

35 MM/D Cryo Plant, Indian Creek Gas Plant, Roberts County, TX, Ex-works Shop.

Job 327

200 MM/D HCDP Plant

200 MM/D HCDP Plant, Sligo, Haughton, LA, Ex-Works Shop.

Job 329, Turnkey

60 MM/D Cryogenic Gas Plant

60 MM/D Cryo Plant, Spearman Gas Plant, Spearman, TX, Turnkey installed.

Job 341, Turnkey

Dehydration Capacity Upgrade

Dehydration Capacity Upgrade, Arapaho 1, Butler, OK, Turnkey Installed.

Job 382

120 MMSCFD Cryogenic Gas Plant

120 MMSCFD Cryogenic Gas Plant designed for rich Delaware Basin shale gas (6.0 gal/mscf), 90% ethane recovery, 99+% propane recovery, and includes: Product treating system, product pumps (1,300 psig discharge pressure), and 30,000 gallon product surge tank, modular MCC building, with 480 volt MCC and 4,160 volt soft starts for three 1,250 HP motors, 4,500 HP refrigeration system, I/A system, ethane rejection and recovery capability.

Job 387

60 MMSCFD Cryogenic Gas Plant

60 MMSCFD Cryogenic Gas Plant, Eddy County, NM, including inlet separator, slug catcher, and stabilization for 4,000 bpd of high-pressure hydrocarbon condensate to 770 bpd of stabilized (10 psia RVP) condensate.

Job 388

200 MMSCFD Cryogenic Gas Plant

200 MMSCFD Cryogenic Gas Plant designed for rich Delaware Basin shale gas (6.0 gal/mscf), 90% ethane recovery, 99+% propane recovery, and includes: Product pumps (1,300 psig discharge pressure), and 30,000 gallon product surge tank, modular MCC building, with 480 volt MCC and 4,160 volt soft starts for three 1,250 HP motors 4,500 HP refrigeration system, I/A system, ethane rejection and recovery capability.

Job 417

200 MMSCFD Cryogenic Gas Plant

200 MMSCFD Cryogenic Gas Plant designed for rich Delaware Basin shale gas (7.0 gal/f), 90% ethane recovery, 99+% propane recovery, and includes: Product pumps (1,300 psig discharge pressure), and 30,000 gallon product surge tank Modular MCC building, with 480 volt MCC and 4,160 volt soft starts for three 1,250 HP motors 4,500 HP refrigeration system, I/A system, ethane rejection and recovery capability. A high-pressure hydrocarbon condensate stabilization system is included along with an 800 GPM inlet amine treater.

Job 420

200 MMSCFD Cryogenic Gas Plant

200 MMSCFD Cryogenic Gas Plant designed for rich Delaware Basin shale gas (7.0 gal/mscf), 90% ethane recovery, 99+% propane recovery, and includes: Product pumps (1,300 psig discharge pressure), and 30,000 gallon product surge tank Modular MCC building, with 480 volt MCC and 4,160 volt soft starts for three 1,250 HP motors, 4,500 HP refrigeration system, I/A system, ethane rejection and recovery capability.

Job 299

20 MMSCFD Cryogenic Gas Plant For Counterpoint Energy

Redesigned and refurbished 20 MMSCFD cryogenic plant for CenterPoint Energy. Haughton, Louisiana.

Job 321

70 MM/D Cryogenic Gas Plant

70 MM/D Cryo Plant, Waskom 3, Waskom, TX, Turnkey installed

Job 425/446

200 MMSCFD Cryogenic Gas Plant

Jasper has successfully completed and fully executed a LSTK EPC project in the Delaware basin for a repeat client. This is the third train Jasper has completed at this location. This Client chose Jasper’s Standard 200MMSCFD GSP cryogenic gas plant from our inventory, Jasper Amine Contactor and pre-treatment system, Jasper 42 GPM TEG Contactor and Regen System, interconnecting piping, flare, utilities, instrumentation, electrical, MCC, foundations, and a fully automated Allen Bradley control system with Wonderware front end.
Job 322

25 MMSCFD Refrigeration Plant with Stabilizer

Designed and fabricated 25 MMSCFD refrigeration plant with stabilizer. Pampa, Texas.

Job 326

100 MM/D Cryogenic Gas Plant

100 MM/D Cryo Plant, West Johnson Co Gas Plant, West Johnson County, TX, Phase 2

Job 328, Turnkey

80 MM/D Cryogenic Gas Plant

80 MM/D Cryo Plant, Crossroads Gas Plant, Harrison County, TX, Turnkey installed.

Job 330, Turnkey

60 MM/D Cryogenic Gas Plant

60 MM/D Cryo Plant, Arapaho 2 Gas Plant, Butler, OK, Turnkey installed

Job 331, Turnkey

80 MM/D Cryogenic Gas Plant

80 MM/D Cryo Plant, Carthage 2 Gas Plant, Carthage, TX, Turnkey installed

Job 332

35 MM/D Cryogenic Gas Plant

35 MM/D Cryo Plant, Cobb Gas Plant, Clendinin, WV, Ex-Works

Job 340

120 MM/D Cryogenic Gas Plant

120 MM/D Cryo Plant with Depropanizer, Houston 2 Gas Plant, Houston, PA, Ex-works.

Job 342

500 HP Refrigeration Addition

500 HP Refrigeration Addition, Arapaho 2 & NGL Booster Pump Addition, Arapaho 1, Butler, OK.

Job 345

60 MMSCFD Refrigeration Addition

Designed and fabricated 60 MMSCFD refrigeration addition to increase recovery. Butler, Oklahoma.

Job 347

250 GPM Amine Treating Plant

Designed and fabricated 250 gpm amine treating plant. Shreveport, Louisiana.

Job 443

200 MMSCFD Cryogenic Gas Plant

Jasper has successfully completed and fully executed a LSTK EPC project in the Delaware basin for a repeat client. This is the second train Jasper has completed at this location. The client chose Jasper’s standard 200 MMSCFD Cryogenic Plant, along with a 500 GPM Amine Inlet Treater and 4000 BPD Two Tower Stabilizer, interconnecting piping, flare, utilities, instrumentation, electrical, MCC, foundations, and a fully automated Allen Bradley ControlLogix control system with Wonderware front end.

Job 445

200 MMSCFD Cryogenic Gas Plant

Jasper has successfully completed and fully executed a LSTK EPC project in the Delaware basin for a repeat client. This is the second train Jasper has completed at this location. This project consisted of a Jasper 200MMSCFD GSP cryogenic gas plant, Jasper 200 GPM MDEA NGL Treater, 4500bbl harp style slug catchers, interconnecting piping, flare, utilities, instrumentation, electrical, MCC, foundations, fully automated DELTA V control system with SIS.

Job 408

200 MMSCFD Cryogenic Gas Plant

200 MMSCFD Cryogenic Gas Plant designed for rich Delaware Basin shale gas (6.0 gal/mscf), 90% ethane recovery, 99+% propane recovery, and includes: Product pumps (1,300 psig discharge pressure), and 30,000 gallon product surge tank, modular MCC building, with 480 volt MCC and 4,160 volt soft starts for three 1,250 HP motors 4,500 HP refrigeration system, I/A system, ethane rejection and recovery capability.