Designed and fabricated 250 gpm amine treating plant. Shreveport, Louisiana.
Job 420
200 MMSCFD Cryogenic Gas Plant
200 MMSCFD Cryogenic Gas Plant designed for rich Delaware Basin shale gas (7.0 gal/mscf), 90% ethane recovery, 99+% propane recovery, and includes: Product pumps (1,300 psig discharge pressure), and 30,000 gallon product surge tank Modular MCC building, with 480 volt MCC and 4,160 volt soft starts for three 1,250 HP motors, 4,500 HP refrigeration system, I/A system, ethane rejection and recovery capability.
Job 297
Refurbished Cryogenic Plant
Redesigned and refurbished cryogenic turbo-expander plant with amine product testing. Carthage, Texas.
Job 316
50 MMSCFD Cryogenic Gas Plant
Redesigned and refurbished 50 MMSCFD cryogenic turbo-expander plant. Liberty, Texas.
Job 325
35 MM/D Cryogenic Gas Plant
35 MM/D Cryo Plant, Indian Creek Gas Plant, Roberts County, TX, Ex-works Shop.
120 MMSCFD Cryogenic Gas Plant designed for rich Delaware Basin shale gas (6.0 gal/mscf), 90% ethane recovery, 99+% propane recovery, and includes: Product treating system, product pumps (1,300 psig discharge pressure), and 30,000 gallon product surge tank, modular MCC building, with 480 volt MCC and 4,160 volt soft starts for three 1,250 HP motors, 4,500 HP refrigeration system, I/A system, ethane rejection and recovery capability.
Job 387
60 MMSCFD Cryogenic Gas Plant
60 MMSCFD Cryogenic Gas Plant, Eddy County, NM, including inlet separator, slug catcher, and stabilization for 4,000 bpd of high-pressure hydrocarbon condensate to 770 bpd of stabilized (10 psia RVP) condensate.
Job 388
200 MMSCFD Cryogenic Gas Plant
200 MMSCFD Cryogenic Gas Plant designed for rich Delaware Basin shale gas (6.0 gal/mscf), 90% ethane recovery, 99+% propane recovery, and includes: Product pumps (1,300 psig discharge pressure), and 30,000 gallon product surge tank, modular MCC building, with 480 volt MCC and 4,160 volt soft starts for three 1,250 HP motors 4,500 HP refrigeration system, I/A system, ethane rejection and recovery capability.
Job 417
200 MMSCFD Cryogenic Gas Plant
200 MMSCFD Cryogenic Gas Plant designed for rich Delaware Basin shale gas (7.0 gal/f), 90% ethane recovery, 99+% propane recovery, and includes: Product pumps (1,300 psig discharge pressure), and 30,000 gallon product surge tank Modular MCC building, with 480 volt MCC and 4,160 volt soft starts for three 1,250 HP motors 4,500 HP refrigeration system, I/A system, ethane rejection and recovery capability. A high-pressure hydrocarbon condensate stabilization system is included along with an 800 GPM inlet amine treater.
Job 299
20 MMSCFD Cryogenic Gas Plant For Counterpoint Energy
Redesigned and refurbished 20 MMSCFD cryogenic plant for CenterPoint Energy. Haughton, Louisiana.
Job 345
60 MMSCFD Refrigeration Addition
Designed and fabricated 60 MMSCFD refrigeration addition to increase recovery. Butler, Oklahoma.
35 MM/D Cryo Plant, Cobb Gas Plant, Clendinin, WV, Ex-Works
Job 340
120 MM/D Cryogenic Gas Plant
120 MM/D Cryo Plant with Depropanizer, Houston 2 Gas Plant, Houston, PA, Ex-works.
Job 342
500 HP Refrigeration Addition
500 HP Refrigeration Addition, Arapaho 2 & NGL Booster Pump Addition, Arapaho 1, Butler, OK.
Job 408
200 MMSCFD Cryogenic Gas Plant
200 MMSCFD Cryogenic Gas Plant designed for rich Delaware Basin shale gas (6.0 gal/mscf), 90% ethane recovery, 99+% propane recovery, and includes: Product pumps (1,300 psig discharge pressure), and 30,000 gallon product surge tank, modular MCC building, with 480 volt MCC and 4,160 volt soft starts for three 1,250 HP motors 4,500 HP refrigeration system, I/A system, ethane rejection and recovery capability.