Leadership Changes at Jasper

Whitehouse, Texas (July 31, 2023) – As part of our ongoing commitment to excellence and strategic development, we are pleased to announce a significant transition in leadership. Brent Jasper has carried the responsibilities of both CEO and President for Jasper since 2017. Effective July 27, 2023, Brent transitioned to a full-time CEO role. He will […]

Jasper Ventures, Inc. opening new office space in Tulsa, Okla.

Whitehouse, Texas (April 5, 2023) – Jasper Ventures, Inc. is pleased to announce the opening of a new satellite office in Tulsa, Okla. focused primarily on engineering and design. The recently purchased office building is located at 91st Street and Yale Street, in one of the most vibrant areas in the city. “Historically Tulsa has […]

Jasper Ventures, Inc. Announces the Passing of Founder, Jon Jasper

Whitehouse, Texas (April 1, 2023) – With great sadness, Jasper Ventures, Inc. announces the passing of Jon E. Jasper, founder and chairman for Jasper Ventures, Inc. He passed away peacefully surrounded by his family, following a battle with brain cancer on March 31, 2023. He was an iconic leader in the natural gas industry who […]

Jasper Ventures Honored with Safety Award

Whitehouse, Texas (July 1, 2021) – GPSA, an association representing gas processing midstream service and supply companies, announced that Jasper Ventures is being honored for their outstanding 2020 safety performances. “We are incredibly honored to receive this award. The focus of our company has always been on our people, our customers and the communities we […]

Jasper Ventures Opens Event Center

Whitehouse, Texas – Jasper Ventures is pleased to announce its new office space and event center. The new office space has allowed us to co-locate our engineering, design and drafting, automation and document control teams.  This space is truly a blessing that has already resulted in increased collaboration and teamwork. “It is neat to see […]

Jon Jasper Receives GPA Midstream Association Recognition Award

Written by: Aaron Glover On Wednesday, April 17, 2019, Jon Jasper, founder and chairman of Jasper Ventures, Inc. received the GPA Midstream Association Recognition Award. This award is given to those individuals who have been recognized as having an extensive and successful career in the midstream industry. It also recognizes those whose business careers and relationships have […]

Kingdom at Work

On December 3, our President, Brent Jasper, and Vice President of People, Carrie-Ann Jasper-Yearty, took a trip with a small group of local business owners and executives to learn more about God’s Kingdom work in the marketplace. The trip was organized and led by Kevin East, President and CEO of the Mentoring Alliance, as an […]

Smith County approves tax abatement package for Jasper Ventures

Articled originally posted at: www.tylerpaper.com By Erin Mansfield, [email protected] | Nov 13, 2018 Smith County officials have agreed to give five years of tax abatements on an expansion at Jasper Ventures Inc. in the southeastern part of the county. The Smith County Commissioners Court approved the manufacturing company’s tax abatement package 4-0 at a regular meeting […]

Splash Pad coming to East Texas

Originally posted at kltv.com By Nytesia Ross | October 8, 2018 at 1:02 PM CDT – Updated October 8 at 1:04 PM TROUP, TX (KLTV) – The City of Troup, in cooperation with the Joe Layne Family Splash Pad broke ground Monday. “This had been an exciting journey for the citizens and friends of Troup,” Mayor Joe Carlyle […]

Job 423

200 MMSCFD Cryogenic Plant

Jasper has successfully completed and fully executed a LSTK EPC project in the Delaware basin for a repeat client. This is the third train Jasper has completed at this location. The client chose Jasper’s standard 200 MMSCFD Cryogenic Plant, along with a 290 GPM Amine Inlet Treater and 3800 BPD Single Tower Stabilizer, interconnecting piping, flare, utilities, instrumentation, electrical, MCC, foundations, and a fully automated Allen Bradley ControlLogix control system with Wonderware front end.

Job 318

30 MM/D Cryogenic Gas Plant

30 MM/D Cryo Plant, Waskom 2, Waskom, TX, Turnkey Installed

Job 297

Refurbished Cryogenic Plant

Redesigned and refurbished cryogenic turbo-expander plant with amine product testing. Carthage, Texas.

Job 316

50 MMSCFD Cryogenic Gas Plant

Redesigned and refurbished 50 MMSCFD cryogenic turbo-expander plant. Liberty, Texas.

Job 325

35 MM/D Cryogenic Gas Plant

35 MM/D Cryo Plant, Indian Creek Gas Plant, Roberts County, TX, Ex-works Shop.

Job 327

200 MM/D HCDP Plant

200 MM/D HCDP Plant, Sligo, Haughton, LA, Ex-Works Shop.

Job 329, Turnkey

60 MM/D Cryogenic Gas Plant

60 MM/D Cryo Plant, Spearman Gas Plant, Spearman, TX, Turnkey installed.

Job 341, Turnkey

Dehydration Capacity Upgrade

Dehydration Capacity Upgrade, Arapaho 1, Butler, OK, Turnkey Installed.

Job 382

120 MMSCFD Cryogenic Gas Plant

120 MMSCFD Cryogenic Gas Plant designed for rich Delaware Basin shale gas (6.0 gal/mscf), 90% ethane recovery, 99+% propane recovery, and includes: Product treating system, product pumps (1,300 psig discharge pressure), and 30,000 gallon product surge tank, modular MCC building, with 480 volt MCC and 4,160 volt soft starts for three 1,250 HP motors, 4,500 HP refrigeration system, I/A system, ethane rejection and recovery capability.

Job 387

60 MMSCFD Cryogenic Gas Plant

60 MMSCFD Cryogenic Gas Plant, Eddy County, NM, including inlet separator, slug catcher, and stabilization for 4,000 bpd of high-pressure hydrocarbon condensate to 770 bpd of stabilized (10 psia RVP) condensate.

Job 388

200 MMSCFD Cryogenic Gas Plant

200 MMSCFD Cryogenic Gas Plant designed for rich Delaware Basin shale gas (6.0 gal/mscf), 90% ethane recovery, 99+% propane recovery, and includes: Product pumps (1,300 psig discharge pressure), and 30,000 gallon product surge tank, modular MCC building, with 480 volt MCC and 4,160 volt soft starts for three 1,250 HP motors 4,500 HP refrigeration system, I/A system, ethane rejection and recovery capability.

Job 417

200 MMSCFD Cryogenic Gas Plant

200 MMSCFD Cryogenic Gas Plant designed for rich Delaware Basin shale gas (7.0 gal/f), 90% ethane recovery, 99+% propane recovery, and includes: Product pumps (1,300 psig discharge pressure), and 30,000 gallon product surge tank Modular MCC building, with 480 volt MCC and 4,160 volt soft starts for three 1,250 HP motors 4,500 HP refrigeration system, I/A system, ethane rejection and recovery capability. A high-pressure hydrocarbon condensate stabilization system is included along with an 800 GPM inlet amine treater.

Job 420

200 MMSCFD Cryogenic Gas Plant

200 MMSCFD Cryogenic Gas Plant designed for rich Delaware Basin shale gas (7.0 gal/mscf), 90% ethane recovery, 99+% propane recovery, and includes: Product pumps (1,300 psig discharge pressure), and 30,000 gallon product surge tank Modular MCC building, with 480 volt MCC and 4,160 volt soft starts for three 1,250 HP motors, 4,500 HP refrigeration system, I/A system, ethane rejection and recovery capability.

Job 299

20 MMSCFD Cryogenic Gas Plant For Counterpoint Energy

Redesigned and refurbished 20 MMSCFD cryogenic plant for CenterPoint Energy. Haughton, Louisiana.

Job 321

70 MM/D Cryogenic Gas Plant

70 MM/D Cryo Plant, Waskom 3, Waskom, TX, Turnkey installed

Job 425/446

200 MMSCFD Cryogenic Gas Plant

Jasper has successfully completed and fully executed a LSTK EPC project in the Delaware basin for a repeat client. This is the third train Jasper has completed at this location. This Client chose Jasper’s Standard 200MMSCFD GSP cryogenic gas plant from our inventory, Jasper Amine Contactor and pre-treatment system, Jasper 42 GPM TEG Contactor and Regen System, interconnecting piping, flare, utilities, instrumentation, electrical, MCC, foundations, and a fully automated Allen Bradley control system with Wonderware front end.
Job 322

25 MMSCFD Refrigeration Plant with Stabilizer

Designed and fabricated 25 MMSCFD refrigeration plant with stabilizer. Pampa, Texas.

Job 326

100 MM/D Cryogenic Gas Plant

100 MM/D Cryo Plant, West Johnson Co Gas Plant, West Johnson County, TX, Phase 2

Job 328, Turnkey

80 MM/D Cryogenic Gas Plant

80 MM/D Cryo Plant, Crossroads Gas Plant, Harrison County, TX, Turnkey installed.

Job 330, Turnkey

60 MM/D Cryogenic Gas Plant

60 MM/D Cryo Plant, Arapaho 2 Gas Plant, Butler, OK, Turnkey installed

Job 331, Turnkey

80 MM/D Cryogenic Gas Plant

80 MM/D Cryo Plant, Carthage 2 Gas Plant, Carthage, TX, Turnkey installed

Job 332

35 MM/D Cryogenic Gas Plant

35 MM/D Cryo Plant, Cobb Gas Plant, Clendinin, WV, Ex-Works

Job 340

120 MM/D Cryogenic Gas Plant

120 MM/D Cryo Plant with Depropanizer, Houston 2 Gas Plant, Houston, PA, Ex-works.

Job 342

500 HP Refrigeration Addition

500 HP Refrigeration Addition, Arapaho 2 & NGL Booster Pump Addition, Arapaho 1, Butler, OK.

Job 345

60 MMSCFD Refrigeration Addition

Designed and fabricated 60 MMSCFD refrigeration addition to increase recovery. Butler, Oklahoma.

Job 347

250 GPM Amine Treating Plant

Designed and fabricated 250 gpm amine treating plant. Shreveport, Louisiana.

Job 443

200 MMSCFD Cryogenic Gas Plant

Jasper has successfully completed and fully executed a LSTK EPC project in the Delaware basin for a repeat client. This is the second train Jasper has completed at this location. The client chose Jasper’s standard 200 MMSCFD Cryogenic Plant, along with a 500 GPM Amine Inlet Treater and 4000 BPD Two Tower Stabilizer, interconnecting piping, flare, utilities, instrumentation, electrical, MCC, foundations, and a fully automated Allen Bradley ControlLogix control system with Wonderware front end.

Job 445

200 MMSCFD Cryogenic Gas Plant

Jasper has successfully completed and fully executed a LSTK EPC project in the Delaware basin for a repeat client. This is the second train Jasper has completed at this location. This project consisted of a Jasper 200MMSCFD GSP cryogenic gas plant, Jasper 200 GPM MDEA NGL Treater, 4500bbl harp style slug catchers, interconnecting piping, flare, utilities, instrumentation, electrical, MCC, foundations, fully automated DELTA V control system with SIS.

Job 408

200 MMSCFD Cryogenic Gas Plant

200 MMSCFD Cryogenic Gas Plant designed for rich Delaware Basin shale gas (6.0 gal/mscf), 90% ethane recovery, 99+% propane recovery, and includes: Product pumps (1,300 psig discharge pressure), and 30,000 gallon product surge tank, modular MCC building, with 480 volt MCC and 4,160 volt soft starts for three 1,250 HP motors 4,500 HP refrigeration system, I/A system, ethane rejection and recovery capability.